Audits and FAT's

Multi-Conveyor works with our customer through the entire process.  Factory Acceptance Tests (FAT) are done at our location on a regular basis by our customers.  We invite them to see the equipment, in action, well before we dismantle and prepare for shipment.Sell Sheet

In many cases, after coming to an FAT, a customer may decide to tweak the conveyor or device that we've designed with them.  This could be due to their own line changes that came later in the project, or based on what they have seen at the FAT that they choose to adjust from their original request. The fact that Multi-Conveyor is a leader in custom conveying systems, coupled with our expert team of designers, engineers and electrical wizards, we are one of the only companies that can make these changes happen when nearing completion of an already designed conveyor.

Audits can also be performed at your location to evaluate existing equipment or help in the placement of new conveyors or devices.  We will come and measure the footprint of the area you need to achieve the conveying processing for that part of the line so our expert estimators and concept teams are completely aware of design parameters.

Can you say that about your current conveyor manufacturer?

Click on our latest piece of literature that explains the Multi-Conveyor advantage!

spacer